Crankcase

Example: Crankcase

Production line

 

1. Enter machining contents

 

2. Workplan
Workplan

The workplan describes a complete manufacturing system with various machines and clamping variants (fixtures). The different machine groups (OPs) are considered separately in order to allow an optimum process design, e.g. to balance out the OP times.

 

3. Overview of production lines
Overview of production lines

The machine groups used in the process (OPs) can be compared in an overview of the production lines. Capacity planning shows the required OPs as well as the resources used, e.g. magazines. Furthermore, the capacity utilisation of the OPs can also be shown in a bar chart.

For more options also see the Crossmember example.

Contact

i.R.T.
Ingenieurbuero Reinhard Thomann
Nieberser Str. 12
87760 Lachen
Germany

 

We are Social

For more than 20 years Ingenieurbuero Thomann has been a reliable service provider for mechanical engineering, focusing on production planning and organisation.

Ingenieurbuero Thomann | +49.8331.94337-0 |